SEVEN VEGA - Campaign 5

Ærfugl phase 2 - Seven Vega Campaign 5

SEVEN VEGA carried out the installation of the 16”/10" Pipe-in-Pipe with EHTF for the Phase 2 of the Ærfugl project.